Definition: Juran Trilogy
March 18, 2012
Three managerial processes identified by J.M. Juran for use in managing for quality:
1. quality planning
2. quality control
3. quality improvement
Tip excerpted from: The Professional’s Guide to Maintenance and Reliability Terminology by Ramesh Gulati, Jerry Kahn and Robert Baldwin
Previous tip: The Impact of Language on RCA Investigations
Next tip: 8 Keys to a Good Balancing Job
« Back to all maintenance tips
Have your say

- Alignment and Balancing
- Asset Management
- CMMS and EAM
- Green Reliability
- Human Asset Management
- Infrared Thermal Imaging
- KPIs - Reliability Performance Metrics
- Lean Maintenance
- Lubrication
- Maintenance Management
- Motor and Power System Testing
- MRO - Spares Management
- Oil and Fluid Analysis
- Planning and Scheduling
- PM Optimization
- Predictive Maintenance and Condition Monitoring Management
- Reliability-Centered Maintenance
- Reliability Engineering
- Reliability Leadership
- Root Cause Analysis
- Shutdowns and Turnarounds
- Total Productive Maintenance (Asset Care)
- Training
- Ultrasonics
- Vibration Analysis

- Alignment and Balancing
- Asset Management
- CMMS and EAM
- Green Reliability
- Human Asset Management
- Infrared Thermal Imaging
- KPIs - Reliability Performance Metrics
- Lean Maintenance
- Lubrication
- Maintenance Management
- Motor and Power System Testing
- MRO - Spares Management
- Oil and Fluid Analysis
- Planning and Scheduling
- PM Optimization
- Predictive Maintenance and Condition Monitoring Management
- Reliability-Centered Maintenance
- Reliability Engineering
- Reliability Leadership
- Root Cause Analysis
- Shutdowns and Turnarounds
- Total Productive Maintenance (Asset Care)
- Training
- Ultrasonics
- Vibration Analysis
Advertisement




Comments
There are no comments for this article yet. Why not add one?