fig 1

2000: NPMA and ASTM International establish ASTM Committee E53 Asset/Property Management Systems Standards
https://www.npma.org/Pages/ASTM.htm •  http://www.astm.org/COMMITTEE/E53.htm

2004: IAM developed PAS 55 published by BSI  • http://theiam.org/

2008: PAS 55 v2 published by BSI • http://shop.bsigroup.com/en/ProductDetail/?pid=000000000030171836

Winter 2009: BSI proposes PAS 55 as the basis for an ISO Management Systems Standard for Asset Management • http://theiam.org/products-and-services

Spring 2009: ASTM E53 decides to engage in the ISO Asset Management standards development process

November 2009: ASTM E53 approved as official U.S. Technical Advisory Group (US TAG) by ANSI • www.uspc251tag.org/

June 2010: Preliminary Meeting of ISO Asset Management Committee in London, England

September 2010: ISO approval of PC 251, Asset Management Systems

January 2011: First Working Draft (WD1) released

February 2011: U.S. comments on WD1 submitted by US TAG

March 2011: First Official Meeting of PC 251 in Melbourne, Australia

April 2011: Working Draft 2 (WD2) released for comments

June 2011: US TAG Face-to-Face Meeting at ASTM HQ in Philadelphia, PA

August 2011: U.S. comments on WD2 submitted by US TAG

October 2011: Second Official Meeting of ISO PC 251 in Arlington, VA (hosted by US TAG)

November 2011: First Committee Draft (CD1) for comments releasedDecember 2011: US TAG Face-to-Face meeting to craft U.S. comments at AMP Conference in Bonita Springs, FL

January 2012: U.S. comments on CD1 submitted by US TAG

February 2012: Third Official Meeting of ISO PC 251 in Pretoria, South Africa

March 2012: Second Committee Draft (CD2) for comments released

April 2012: US TAG Face-to-Face meeting to craft U.S. comments at Meridium Conference in Jacksonville, FL

May 2012: U.S. comments on CD2 submitted by US TAG

June 2012: Fourth Official Meeting of ISO PC 251 in Prague, Czech Republic

September 2012: Draft International Standard (DIS) released for ballot and comment

January 2013: US TAG Face-to-Face Meeting to discuss, comment and vote on the DIS for Ballot

February 2013: US Vote and Comments on DIS to be submitted by US/TAG

April 2013: Fifth Official Meeting of ISO PC 251 in Calgary, Canada

November/December 2013: FDIS ballot (if necessary)

February 2014: Target date for the release of ISO 55000

Publisher's note: What do you think ISO-55000 Asset Management Standards mean for maintenance reliability professionals? Email Uptime Magazine Publisher Terrence O'Hanlon: tohanlon@reliabilityweb.com.

authorJim Dieter is the Director of Strategic Programs for Sunflower SystemsTMand U.S. Head of Delegation on ISO PC 251 developing ISO 55000 • www.sunflowersystems.com

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
“Steel-ing” Reliability in Alabama

A joint venture between two of the world’s largest steel companies inspired innovative approaches to maintenance reliability that incorporate the tools, technology and techniques of today. This article takes you on their journey.

Three Things You Need to Know About Capital Project Prioritization

“Why do you think these two projects rank so much higher in this method than the first method?” the facilitator asked the director of reliability.

What Is Industrial Maintenance as a Service?

Industrial maintenance as a service (#imaas) transfers the digital and/or manual management of maintenance and industrial operations from machine users to machine manufacturers (OEMs), while improving it considerably.

Three Things You Need to Know About Criticality Analysis

When it comes to criticality analysis, there are three key factors must be emphasized.

Turning the Oil Tanker

This article highlights the hidden trap of performance management systems.

Optimizing Value From Physical Assets

There are ever-increasing opportunities to create new and sustainable value in asset-intensive organizations through enhanced use of technology.

Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022