IMC is set to revolutionize how we think about Asset Management. Happening in Marco Island, Dec 16th - 19th 2024

IMC 2024 is designed to equip you with the knowledge, strategies, and tools needed to lead with foresight and innovation.

Sign Up

Please use your business email address if applicable

Why: Capability is a component of the effectiveness equation and usually under the control of production.

When: Data for this metric is frequently produced by the Accounting department each month as a segment of the financial reports for the purpose of handling variances against the standards.

Where: Frequently in the effectiveness measure it is a weak point [as a measure of how well the production process des the job for which it was purchased] requiring substantial improvement that cannot be solved by the usual reliability and maintainability (RAM) tools. However, this metric may be deficient from the original design [an issue of design effectiveness] of the system or from the way the system is operated [an issue of use effectiveness].

These definitions are written by H. Paul Barringer and are also posted on his web site at www.barringer1.com

Return to Reliability Tools

ChatGPT with
ReliabilityWeb:
Find Your Answers Fast
Start