Opportunity 1: Application of Motor Diagnostics for Periodic Testing
In a recent study, 1,054 motors were evaluated with MCA in a marine environment. The motor system owner's previous program involved the use of insulation to ground testing with a pass/fail limit of 1 MegOhm. The selected technology used in the study was an ALL-TEST IV PRO 2000 motor circuit analyzer which obtains data on resistance, impedance, inductance, phase angle, current/frequency response and insulation to ground testing.
During the period of testing, 35 machines were found to have insulation resistance values of ‘0' MegOhms. A total of 398 machines had a variety of potential faults identified as developing winding shorts, winding contamination, poor connections and/or a combination of faults (Figure 1).
Figure 1: Faults and Types Detected
Of the 35 machines with low insulation resistance values, only one failed during the following eight months. This machine was also identified with developing winding faults. Of the remaining 363 machines, over 20% were identified as having failed over the next eight months. Note that additional machines may have also failed, however the data was limited based upon the accuracy of failure data entered into the associated CMMS software system.
A majority of the 1,054 machines were considered critical, with a number of them including fire pumps. Most of the identified motors were allowed to operate to failure. One of the significant issues identified in this study was that the application followed along with the expected 1 in 4 to 1 in 6 motors being identified with potential faults as identified in the 2003 "Motor Diagnostics and Motor Health Study."
Opportunity 2: Application of Motor Diagnostics for Predictive Maintenance
In 1996, a field service company initiated a motor diagnostics program utilizing an MCA device. The results were dramatic in that the number of annual motor repairs dropped by over 33% while production remained constant (Figure 2). The impact was an improvement in equipment availability and planned outage overhauls (the correct machines were removed for attention). There was also a direct reduction in emergency work orders by over 66%, which directly translated into a reduction in maintenance overtime costs and allowing a higher rate of completed PM's.
Figure 2: Motor Failures 1996 to 2003
Program started in 1996 and eliminated at end of 2001
Notably, in this study, was the fact that electric motor repairs were not eliminated However, the severity of the remaining repairs were reduced.
Following several years of success (1996 to 2001), new management made the decision to eliminate the motor diagnostic program. In less than 18 months, the conditions that existed prior to the application of the program returned. The result was a dramatic increase in maintenance costs associated with the electric motors, increased unplanned downtime, additional overtime man-hours and emergency work orders.
Figure 3: % Emergency Calls Related to Motors
Opportunity 3: The Application of Motor Diagnostics for Condition Monitoring
A Midwestern transmission manufacturing facility with an existing, and successful, infrared, ultrasonics and vibration program implemented Motor Circuit Analysis to support the program. The results were fairly dramatic within the first quarter of implementation in 2002:
* Reduction in troubleshooting time of over 50%
* Reduction of ‘no problem found' reports, for rotating machines sent to repair shops, by over 80%
* Reduction of repair costs for rotating machines by over 50%, when repairs were proactive. For example: Winding contamination resulting in clean-dip-and-bake versus allowing servo motors to run to failure, resulting in rewind.
* Reduction in motor system life-cycle clost of about 35%
Average maintenance man-hour savings for the first three quarters of 2002 were $30,000 per quarter. Immediately following the implementation of the motor diagnostics program in the middle of the third quarter of 2002, the amount increased to $300,000 per month, not including any production or other cost avoidance.
Conclusion
The implementation of an Electrical Motor Diagnostics program, and attention to the health of your motor system, will have immediate and significant impact on your maintenance program and the profitability of your company. As will be demonstrated in future articles, the implementation of an electric motor system maintenance and management program can have even more dramatic effects.
Richard Borge
Performance Evaluation has been testing electrical equipment for the past 22 years with an assortment of test equipment. Performance has used both static and dynamic tests to help prevent unscheduled downtime. The testing inludes AC/ DC motors of all sizes and transformers. Performance contact is Richard Borge, www.performancetdr.com, 888-484-7564, perfeval@aol.com and 973-661-4281 (fax).
Howard W Penrose, Ph.D. is the President of SUCCESS by DESIGN, a reliability and maintenance consulting, publishing and training firm. Dr Penrose has over 20 years experience in the electrical maintenance and reliability field. He is the Executive Director of the Institute of Electrical Motor Diagnostics (IEMD.org). Howard can be reached at howard@motordoc.net