FREE copy of the Uptime Elements Implementation Guide once you subscribe to Reliability Weekly

I appreciate Mr. Webster bringing risk calculation methodology to the forefront for discussion. The focus of my article was limited to the overall processes of analysis rather than specifics. The very character of risk is an excellent topic in further exploration of these important concepts and principles.

Mr. Webster contrasts positional risk - determined using distance in space as I suggested in my article on traditional risk - calculated using a simple product of consequence and probability (which I will refer to as actuarial risk because it merely expresses risk as cost-over-time).

I first emphasize that both risk calculation methods have value and place. In fact, my intent is to supplement rather than supplant actuarial risk. It is important to understand the value and how each method should be used. There is no correct or incorrect method, rather better and poorer applications for each.

Mr. Webster suggests that using positional risk is synonymous to simply adding voltage and current to get power (wattage) for a motor. In fact, Euclidean distance is more closely related to the product of the components than to the sum and most importantly incorporates the fact that consequence and probability are two very different characterized contributors to risk. Positional risk is a "planer" calculation rather than a linear one. Think of consequence as a north-south value, while probability is an east-west value, with positional risk being distance over the landscape. Figure 1 shows a simplified comparison of constant risk lines using positional risk and actuarial risk calculation methods along with points for many risk events one might encounter within a real system represented as dots.

For an electrical motor, wattage is certainly a limit for the motor in many ways. However, it is not the ONLY limitation. Voltage limits exist that are based on insulation capabilities. On the other hand, amperage limitations are based on heat dissipation capabilities - quite different characteristics and also different from those associated with wattage limits, such as shaft torque, etc. Hypothetically, even with extremely low voltage applied to a motor, high current could damage the motor even though the total wattage is far below acceptable levels. Similarly, extremely high voltage could damage the motor even if far below wattage limits. In a motor (any electrical circuit), we need to be concerned about outliers in respect to ANY of the three aspects: voltage, current, or wattage. Likewise, we need to identify outliers in any of the three aspects of risk: consequence, probability, or actuarial. It is easy to see in Figure 1 that positional risk identifies outliers, while actuarial risk limits outlier identification to only those based on actuarial risk.

This is further demonstrated in chart form. Figure 2 is produced using positional risk calculations. It shows that outliers along each axis (rows one and four) calculate risk values comparable with outliers in actuarial risk (row three) and greater than values for non-outliers, such as row two.

Figure 3, with the same four points as Figure 2, shows that actuarial risk calculates very low values for even extreme outliers along the axes (rows one and three) similar in value to non-outlying points such as Row 2. Only the single actuarial risk outlier is identified.

The essential aspects of identifying outliers that are closer to the axes are many, but the two most important are to avoid becoming "bean counter" driven and to find real opportunities for improvement. Actuarial risk methods likely would not have identified significantly major, but rare events, like the Bhopal disaster, the Fukushima nuclear reactor disaster, or the BP oil spill, because their extremely low probability would relegate them to obscurity. Positional risk methodology might have made all three possibilities clear and difficult to downplay. On the other end of the spectrum, extremely frequent but relatively low consequence events would also be ignored by actuarial risk, resulting in "consequence leaks" that might add up to major overall significance and multiple lost opportunities for improvement, known as pound wise and penny foolish.

Once outliers are identified using positional risk, then responsive actions can be evaluated for potential outcomes and compared to as-is or alternative cases. This is where actuarial risk is rightly applied as suggested by Mr. Webster's comparison of his cases A and B. As he suggests, a real and actual improvement in risk profile is necessary to justify making the change. We don't want to just move the problem from one of consequence to one of probability, or the other way around.

Just as actuarial risk is less valid for discriminating and prioritizing opportunities and challenges, positional risk is less valid for evaluating effectiveness of various options to address those opportunities and challenges. In essence, positional risk is the horse and actuarial risk is the cart. We should not use a cart in place of a horse, or the other way around. As we all know, we shouldn't put the cart in front of the horse.

Terry Nelson is a consultant and thought leader in physical asset management. Based in Washougal, Washington, he has decades of experience in nuclear power, water utilities and other industrial processes. www.uberlytics.com.

Read Terry's original article - Risk & Criticality

Upcoming Events

August 8 - August 10, 2023

Maximo World 2023

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Defect Elimination in the context of Uptime Elements

Defect Elimination means a lot of things to a lot of people. Uptime Elements offers a specific context for defect elimination [DE] as a success factor on the reliability journey [RJ].

Internet of Things Vendors Disrupting the Asset Condition Management Domain at IMC-2022

Internet of Things Vendors Disrupting the Asset Condition Management Domain at IMC-2022 The 36th International Maintenance Conference collocated with the RELIABILITY 4.0 Digital Transformation Conference [East]

Asset Management Technology

The aim of the Asset Management technology domain is to assure that IT/OT systems are focused on creating the value from the assets and that the business can deliver to achieve organizational objectives as informed by risk.

TRIRIGAWORLD AWARDS at MaximoWorld 2022

TRIRIGAWORLD AWARDS honors excellence in space optimization and facility management, A Reliabilityweb.com event to further advance asset management

IMC-2022 Who's Who: The World's Best Run Companies

The International Maintenance Conference (IMC) provides a fresh, positive community-based curated experience to gain knowledge and a positive perspective for advancing reliability and asset management through people, their managers, the strategy, the processes, the data and the technology. The world’s best-run companies are connecting the workforce, management, assets and data to automate asset knowledge that can be leveraged for huge beneficial decisions.

Uptime Elements Root Cause Analysis

Root Cause Analysis is a problem solving method. Professionals who are competent in Root Cause Analysis for problem solving are in high demand.

Reliability Risk Meter

The asset is not concerned with the management decision. The asset responds to physics

Why Reliability Leadership?

If you do not manage reliability culture, it manages you, and you may not even be aware of the extent to which this is happening!

Asset Condition Management versus Asset Health Index

Confusion abounds in language. Have you thought through the constraints of using the language of Asset Health?

Seven Chakras of Asset Management by Terrence O'Hanlon

The seven major asset management chakras run cross-functionally from the specification and design of assets through the asset lifecycle to the decommissioning and disposal of the asset connected through technology