Arrive with an idea, leave with a 3-year plan. Achieve reliability.

TRC gives you access to cutting-edge knowledge & technology

Sign Up

Please use your business email address if applicable

Defeat The Defect Dragon!

Defeat The Defect Dragon!

The journey from reactive to proactive maintenance is a challenging path many organizations face. The narrative of one such transformation, underpinned by the Uptime Elements Reliability Framework and Asset Management System, highlights a strategic pivot towards defect elimination (DE) to enhance asset performance. This approach, grounded in the Certified Reliability Leader (CRL) training, emphasizes the importance of addressing smaller, less critical failures that, if left unchecked, erode the culture of reliability and hinder the transition from a reactive to a planned maintenance regime.

This transformation underscores the effectiveness of the Uptime Elements Framework and the Certified Reliability Leader [CRL] training in shifting maintenance strategies from reactive to prescriptive and opportunistic.

Uptime Elements also uses cross-functional, Defect Elimination teams to address the 40% of asset or system failure patterns that cannot be addressed through maintenance and asset lifecycle management.

The introduction of a defect elimination program within the organization usually leads to significant financial savings and operational improvements. By fostering an open, continuous improvement roundtable, the organization enabled cross-functional collaboration, empowering those closest to the defects to lead the charge in identifying and addressing them.

This approach is encapsulated in the "Defect Dragon" graphic, which visually educates stakeholders on the causes of defects and the importance of a unified effort to eliminate them.

The graphic outlines several key causes of defects, such as:

  • Raw material and process inputs
  • Operational discipline
  • Maintenance workmanship
  • Maintenance material and storage
  • Design-build-install issues
  • Asset lifecycle data inaccuracies

The rules of the DE program are straightforward and emphasize quick, cost- effective solutions led by those most familiar with the issues. These include:

  • A time frame of less than 30 days for development and implementation
  • A budget cap of $5000,
  • Cross-functional team involvement, and
  • A focus on cumulative benefit tracking.

This program typically results in a 25%-50% reduction in corrective work orders, in addition to fostering a culture of proactive problem-solving and continuous improvement.

  1. Pareto “80/20” analysis to identify “bad actors” and renew the reliability strategy and preventive maintenance plan
  2. Defect elimination to identify opportunities for wider, cross-functional cultural engagement in the reliability journey

The poster highlights Defect Elimination as a superpower in achieving and sustaining high levels of asset performance.

For organizations embarking on a similar journey, this approach serves as a testament to the power of collaboration, continuous improvement, and strategic focus on defect elimination in driving operational excellence and reliability.

For reliability leaders seeking to implement or enhance their defect elimination strategies, the detailed insights and rules provided offer a practical blueprint for success.

SpreadDefect Elimination and Defeat the Defect Dragon!

You and your team are invited to download the Defect Dragon poster by creating a free subscription log-in account at Reliabilityweb.com.

You will also gain access to over 3000 videos, graphics, case studies, and guides, which are invaluable for continuous learning and improvement in the fields of reliability and asset management.

ChatGPT with
ReliabilityWeb:
Find Your Answers Fast
Start