FREE: Introduction to Uptime Elements Reliability Framework and Asset Management System

HELIPLANE LRS with Infrared Thermal Imaging

This new VTOL (Vertical Take Off and Landing) UAV combines the advantages of a multi-rotor UAV with those of a fixed-wing UAV: it takes off vertically like a conventional UAV, thus avoiding the need for take-off and landing strips, and flies like an airplane thanks to an engine placed at the rear of the aircraft.

The transition between vertical and horizontal flight modes is fully automatic. Thanks to the lift generated by its wings and the use of brand new battery technologies, this new HELIPLANE LRS is very durable and can fly for almost 3 hours and cover up to 1600 hectares per flight.

Its ability to ensure flights over such long periods and distances allows it to be deployed in many industrial fields for complex and automatic photogrammetry missions over large areas, long-distance surveillance or high-precision survey missions such as plantation water stress measurements, energy infrastructure inspection missions, etc.Versatile, the HELIPLANE LRS can carry a wide variety of payloads that are easily changed and integrated to cover a multitude of applications:-

  • RGB camera
  • infrared thermal camera
  • multispectral camera
  • lidar

Thanks to its modular design, this VTOL can be assembled in less than a minute, without tools.The HELIPLANE LRS is available in two versions: 2.4 m and 3.4 m wingspan.‘We are pleased to announce the launch of this new version of the HELIPLANE LRS drone, which completes the Group's range of products,’ says Marc Courcelle, CEO of DRONE VOLT. ‘More accomplished than its previous version, this new drone should meet the expectations of many customers in the private and public sectors, which demonstrates once again the relevance of our technological solutions that we are constantly evolving.’More informations : https://www.dronevolt.com/en/expert-solutions/heli...

Upcoming Events

August 8 - August 10, 2023

Maximo World 2023

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
IMC-2022 Who's Who: The World's Best Run Companies

The International Maintenance Conference (IMC) provides a fresh, positive community-based curated experience to gain knowledge and a positive perspective for advancing reliability and asset management through people, their managers, the strategy, the processes, the data and the technology.

Uptime Elements Root Cause Analysis

Root Cause Analysis is a problem solving method. Professionals who are competent in Root Cause Analysis for problem solving are in high demand.

Reliability Risk Meter

The asset is not concerned with the management decision. The asset responds to physics

Why Reliability Leadership?

If you do not manage reliability culture, it manages you, and you may not even be aware of the extent to which this is happening!

Asset Condition Management versus Asset Health Index

Confusion abounds in language. Have you thought through the constraints of using the language of Asset Health?

Seven Chakras of Asset Management by Terrence O'Hanlon

The seven major asset management chakras run cross-functionally from the specification and design of assets through the asset lifecycle to the decommissioning and disposal of the asset connected through technology

Reliability Leader Fluid Cleanliness Pledge

Fluid Cleanliness is a Reliability Achievement Strategy as well as an asset life extension strategy

MaximoWorld 2022 Conference Austin Texas

Connect with leading maintenance professionals, reliability leaders and asset managers from the world's best-run companies who are driving digital reinvention.

“Steel-ing” Reliability in Alabama

A joint venture between two of the world’s largest steel companies inspired innovative approaches to maintenance reliability that incorporate the tools, technology and techniques of today. This article takes you on their journey.

Three Things You Need to Know About Capital Project Prioritization

“Why do you think these two projects rank so much higher in this method than the first method?” the facilitator asked the director of reliability.