IMC Presentation (48:35)
by Gabriela Mejias, Nolimit C.A.
Using the Uptime Elements® through the Transit Map and DÌPF curve to achieve the redesign/changes in sealing systems in all centrifugal pumps on the main Refinery in Ecuador. It will show the benefits of savings associated at direct repair costs (5.5 MUSD) and improvements in maintenance policies
TAKEAWAY: The Transit Map designed from / and Uptime Elements Framework.