APT and OSyS Partnership will enhance Equipment Health Maintenance Solutions

The APT Asset Strategy Library (ASL) contains fully defined preventative maintenance plans addressing common failures for nearly 350 equipment classifications, and is currently in use in power generation, oil & gas refining, and other major industries that represent OSyS markets. The ASL includes more than 21,000 failure modes and 2,000 recommended preventative maintenance strategies, addressing some 60,000 As Found reportable conditions (i.e. failure codes).

OSyS will leverage the ASL to recommend optimum predictive equipment health management (PEHM) solutions to provide pinpoint diagnosis and maintenance recommendations specific to each client’s equipment, operating context, organizational risk and cost goals. In the increasingly cost-conscious global marketplace, ways to achieve new savings, while improving equipment reliability and availability, represent sought-after competitive advantage.

Please visit our Press Room to read the entire release. Thank you for your continued support of APT!

Reliability.AITM

You can ask "R.A.I." anything about maintenance, reliability, and asset management.
Start
Laying the Groundwork: The Role of Naming Conventions in Spare Parts Management Success

This article outlines best practices for overcoming these hurdles and highlights the foundational elements of a successful spare parts management approach.

Industry 5.0 Is Empowering Today’s Factory Workers and It’s a Long Overdue Revolution

The impacts of Industry 4.0 and its younger sibling, Industry 5.0, fall right down to today’s factory workers. While embedded automation and optimization within the Internet of Things (IoT) and Industry 4.0 have the power to drive new efficiencies, they have also led to the introduction of more complex job roles and tasks, but for fewer frontline workers.

From Data to Action: The Complex Path of Advanced Analytics and Reliability in Industry

In today's industrial landscape, the buzz around advanced analytics is hard to ignore. Companies are increasingly looking to harness the power of data to drive efficiency, reduce downtime, and gain a competitive edge. However, the journey from collecting data to taking actionable steps based on that data is far from straightforward.

Engaging and Retaining the Asset Management Workforce

Employee engagement and retention are critical for the success of asset management organizations. High turnover rates and labor shortages pose significant challenges, impacting operational efficiency, safety and overall workforce morale.

Do or Do Not

Data analysis is critical to understanding problems and decision-making. Analysis that is not followed up by an action is likely a wasted opportunity, but not always.

Achieving Trouble Free Bearing Life Through Defect Elimination

When a machine is designed, one of the major considerations the engineer must make is the selection of proper rolling element bearings. Some of the factors to consider in selecting bearings are shaft speeds, loads (both axial and radial), the environment they will run in, how to relube them, the duty cycle, etc.

Who Does This Belong To?

In today’s fast-paced connected world, you and your organization create an abundance of data. In the past, large corporations with multiple locations relied on in person site visits or information provided by the on-site team for updates to productivity in facilities. But what if there was a way to do this remotely?

How Forgotten Data / Information Can Cost Hundreds of Thousands of Dollars

There was a terrible fire in a liquefied petroleum gas (LPG) plant. It destroyed piping and a critical air cooler (fin fan) and damaged pumps, valves, cables and supports. Fortunately, although there were injuries, no one died.

From Good to Great

A large water utility decided to investigate maintenance reliability best practices. There were eight different treatment plants and eight different maintenance managers.

So What?

A week after the plant started up after an annual planned outage, an injection pump motor failed. The motor’s insulation had failed, shorting between phases.

Upcoming Events

MaximoWorld 2025

August 4 - 7, 2025
View all Events

Upcoming Workshops

View all Workshops

“R.A.I.” the Reliability.aiTM Chatbot

Start
ChatGPT with
ReliabilityWeb:
Find Your Answers Fast
Start