Asset Performance Technologies, Inc. (APT)  announced today that Nextera Energy’s Seabrook Station nuclear power plant has selected the PRO-M v8.0 solution to assist with ongoing improvement of its PM programs. According to David Worledge, CEO of APT, “We are very pleased to work with Seabrook Station in this regard. The APT Asset Strategy Library has its origins as the EPRI PM Basis Database but has grown much further in terms of the number of available templates and the tools available for analysis, the PRO-M Solution. Seabrook Station now has significantly enhanced capabilities for reviewing and maintaining the PM programs for the majority of its balance of plant equipment.”

APT’s PRO-M v8.0 solution relies upon the APT Asset Strategy Library (ASL), the world’s largest library of asset strategy templates for industrial equipment. The ASL is currently in use in 84% of the nuclear power generation facilities in the U.S., as well as Japan and South Korea, and was recently validated in the oil and gas industry. It comprises over 320 PM templates addressing a broad range of infrastructure equipment (pumps, valves, motors, compressors, etc.) that are universally applicable to nearly all industries. With in-depth failure mode tables (approximately 60 modes per template) and PM effectiveness mapped to each mode, the ASL forms the basis for APT’s PRO-M optimization tools. In addition to providing the reliability basis for its PM recommendations, PRO-M easily estimates the reliability, availability, and business value added by each PM task as well as by the overall PM program, comparing expert-recommended PM plans with existing or new plans at your facility.

About Asset Performance Technologies

Asset Performance Technologies (APT) produces the revolutionary PRO-M solution that combines a unique optimization software with the APT Asset Strategy Library (ASL), the world’s largest PM library for industrial equipment, to rapidly optimize any PM program. PRO-M and the ASL set the standard for PM Optimization by dynamically adjusting to changing business conditions, plant requirements, and market economics.  They can be used either as standalone solutions or to support corporate PM improvement efforts. www.assetperformanceinc.com

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022

6 Signs Your Maintenance Team Needs to Improve Its Safety Culture

When it comes to people and safety in industrial plants, maintenance teams are the ones who are most often in the line of fire and at risk for injury or death.

Making Asset Management Decisions: Caught Between the Push and the Pull

Most senior executives spend years climbing through the operational ranks. In the operational ranks, many transactional decisions are required each day.

Assume the Decision Maker Is Not Stupid to Make Your Communication More Powerful

Many make allowances for decision makers, saying some are “faking it until they make it.” However, this is the wrong default position to take when communicating with decision makers.

Ultrasound for Condition Monitoring and Acoustic Lubrication for Condition-Based Maintenance

With all the hype about acoustic lubrication instruments, you would think these instruments, once turned on, would do the job for you. Far from it!

Maintenance Costs as a Percent of Asset Replacement Value: A Useful Measure?

Someone recently asked for a benchmark for maintenance costs (MC) as a percent of asset replacement value (ARV) for chemical plants, or MC/ARV%.