CRL 1-hr: 9/26 Introduction to Uptime Elements Reliability Framework and Asset Management System

‘AVEVA Diagrams is much more than just a schematics design program’, explains Dave Wheeldon, Chief Technology Officer, AVEVA.  ‘It is a sophisticated, object-centric application with the ability to effectively create engineering and design data. At the same time, it can control and communicate change across multi-discipline projects that deliver real cost, quality and schedule benefits to our customers’.

AVEVA has developed the latest version of AVEVA Diagrams working closely with customers, including the defence and security company, SAAB.  Mr Wheeldon added, ‘AVEVA Diagrams is a key application within our customers engineering software and we were very happy they were able to provide feedback to AVEVA regarding its future development. Feedback has included that the enhancements can enable engineers to optimise their use of AVEVA Diagrams quickly and easily to work more productively on projects requiring fewer iterations to develop a final, fully compliant and accurate schematic design. Companies have already experienced the benefit of reduced man-hours and improved quality across entire projects’.

Importantly, AVEVA Diagrams also makes it easy to export information to third-party solutions and integrates easily with other AVEVA engineering and design products, including AVEVA Everything3D. This enables the control and sharing of a common set of project information across all disciplines, a prerequisite for the development of Lean Construction methodologies.

AVEVA Diagrams is part of AVEVA’s Integrated Engineering & Design solution, which dramatically improves design and engineering process efficiency for major capital projects, as well as for asset modification and revamps. For more information visit www.aveva.com/AVEVA_Diagrams?tab=3

Upcoming Events

August 8 - August 10, 2023

Maximo World 2023

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Reliability Risk Meter

The asset is not concerned with the management decision. The asset responds to physics

Why Reliability Leadership?

If you do not manage reliability culture, it manages you, and you may not even be aware of the extent to which this is happening!

Asset Condition Management versus Asset Health Index

Confusion abounds in language. Have you thought through the constraints of using the language of Asset Health?

Seven Chakras of Asset Management by Terrence O'Hanlon

The seven major asset management chakras run cross-functionally from the specification and design of assets through the asset lifecycle to the decommissioning and disposal of the asset connected through technology

Reliability Leader Fluid Cleanliness Pledge

Fluid Cleanliness is a Reliability Achievement Strategy as well as an asset life extension strategy

MaximoWorld 2022 Conference Austin Texas

Connect with leading maintenance professionals, reliability leaders and asset managers from the world's best-run companies who are driving digital reinvention.

“Steel-ing” Reliability in Alabama

A joint venture between two of the world’s largest steel companies inspired innovative approaches to maintenance reliability that incorporate the tools, technology and techniques of today. This article takes you on their journey.

Three Things You Need to Know About Capital Project Prioritization

“Why do you think these two projects rank so much higher in this method than the first method?” the facilitator asked the director of reliability.

What Is Industrial Maintenance as a Service?

Industrial maintenance as a service (#imaas) transfers the digital and/or manual management of maintenance and industrial operations from machine users to machine manufacturers (OEMs), while improving it considerably.

Three Things You Need to Know About Criticality Analysis

When it comes to criticality analysis, there are three key factors must be emphasized.