Due to project excesses, billions of dollars are lost annually in oil and gas exploration and production, hydrocarbon and gas processing, chemical, pharmaceutical, and other process industries. According to industry data, over 65 percent of projects greater than $1 billion fail, with companies exceeding their budgets by more than 25 percent or missing schedules by more than 50 percent. Routinely, they also face operational problems continuing through the second year of operations. This consistently poor project performance can be a serious deterrent to process manufacturers considering new investments.

“The industry has reached a tipping point in which projects are not sustainable with current budget and schedule excesses,” said Jim Nyquist, president of Emerson Process Management’s Systems and Solution business (NYSE: EMR). “In order to achieve game-changing performance in projects, it will take a truly transformative and comprehensive approach like Project Certainty.”

Emerson’s Project Certainty begins with early engagement during engineering and design studies to define project goals and high impact strategies to meet those goals. Despite traditionally accounting for approximately 4 percent of a project investment, automation is revealing unique and repeatable ways to eliminate cost, reduce complexity and accommodate late-stage project changes, beyond the automation discipline.

For example, Project Certainty relies on the right design engineering strategy to eliminate centralized control system room requirements by 70 to 80 percent, and can eliminate piping in some applications up to 50 to 60 percent. Additionally, tens of millions of dollars in capital spare parts can be eliminated through project-wide equipment reliability analysis.

“Project Certainty also tackles complexity by decoupling the dependencies suppliers have on each other, eliminating bottlenecks and allowing concurrent work streams,” said Nyquist. “Likewise, we are addressing the complexity of data and documentation with innovative technologies that provide features like a single source of project data as well as automated documentation.”

Addressing one of the greatest project vulnerabilities, Project Certainty significantly improves project schedule performance. Revolutionary technologies like Electronic Marshalling with CHARMs, and pervasive wireless field instrumentation are helping project teams accommodate inevitable last-minute design changes without impacting schedule.

“The path to Top Quartile project performance is right in front of us,” said Nyquist. “The technologies and proven methodologies are here. It will take collaboration and commitment to eliminate outdated project approaches and drive change into the industry.”

About Emerson Process Management

Emerson Process Management (www.EmersonProcess.com), an Emerson business, is a leader in helping businesses automate their production, processing and distribution in the chemical, oil and gas, refining, pulp and paper, power, water and wastewater treatment, mining and metals, food and beverage, life sciences and other industries. The company combines superior products and technology with industry-specific engineering, consulting, project management and maintenance services. Its brands include BettisTM, DeltaVTM, FisherTM, Micro MotionTM, OvationTM and RosemountTM.

About Emerson

Emerson (NYSE: EMR), based in St. Louis, Missouri (USA), is a global leader in bringing technology and engineering together to provide innovative solutions for customers in industrial, commercial, and consumer markets around the world. The company is comprised of five business segments: Process Management, Industrial Automation, Network Power, Climate Technologies, and Commercial & Residential Solutions. Sales in fiscal 2014 were $24.5 billion. For more information, visit Emerson.com.

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022

6 Signs Your Maintenance Team Needs to Improve Its Safety Culture

When it comes to people and safety in industrial plants, maintenance teams are the ones who are most often in the line of fire and at risk for injury or death.

Making Asset Management Decisions: Caught Between the Push and the Pull

Most senior executives spend years climbing through the operational ranks. In the operational ranks, many transactional decisions are required each day.

Assume the Decision Maker Is Not Stupid to Make Your Communication More Powerful

Many make allowances for decision makers, saying some are “faking it until they make it.” However, this is the wrong default position to take when communicating with decision makers.

Ultrasound for Condition Monitoring and Acoustic Lubrication for Condition-Based Maintenance

With all the hype about acoustic lubrication instruments, you would think these instruments, once turned on, would do the job for you. Far from it!

Maintenance Costs as a Percent of Asset Replacement Value: A Useful Measure?

Someone recently asked for a benchmark for maintenance costs (MC) as a percent of asset replacement value (ARV) for chemical plants, or MC/ARV%.