The new, second-generation Operations Center, located in Mesa, Ariz., is fully compliant with North American Electric Reliability Corporation (NERC) standards and is designed to be scalable to accommodate the growing global fleet of PV power plants in First Solar’s O&M program. First Solar currently operates for its customers 14 plants with 460 megawatts (MW) of peak generating capacity, which will increase to 23 plants with 850 MW of capacity by year-end and 27 plants with 2,200 MW of capacity in 2013.

First Solar's new industry-leading global Operations CenterThe Operations Center and its expert staff maximize power plant availability and reduce costs for customers by preventing potential problems from occurring and quickly and efficiently fixing those that do. The Operations Center collects and processes a wide range of real-time power plant data, including electrical performance, equipment status and weather data, which are monitored and analyzed against key performance and operational parameters. Automated data analysis detects issues in the plants and automatically dispatches maintenance crews to resolve them, and proprietary algorithms developed using years of O&M data enable the system to predict potential issues and schedule preventive maintenance before a problem occurs.

A key feature of First Solar’s power plant design is its advanced plant controls, which are critical for managing grid reliability and stability and can be controlled remotely from the Operations Center. Features include ramp-rate control, which limits how fast a power plant’s output increases or decreases in order to minimize grid disruption; ride-through capability, which enables a power plant to operate through faults and other grid disturbances; active power control, which can be used to modulate power output; and frequency droop control, which enables a power plant to provide critical grid support when grid frequency is changing. These tools have become increasingly important as more solar generating capacity is connected to the grid.

“Our years of experience and investment have enabled us to build a proprietary system that allows us to optimize our customers’ power plants to produce the maximum amount of energy and revenue under their power purchase agreements while minimizing costs and risk,” said Bob Callery, Vice President of O&M. “The vast quantity of data we gather also gives us invaluable insight into the real-word performance of our products and supports the continuous improvement of our power plants.”

“Predictability and reliability have become increasingly critical to utilities and grid operators as large-scale renewable power plants are connected to the grid,” said Mahesh Morjaria, Vice President of Global Grid Integration. “First Solar has invested considerable time and resources to ensure our power plants integrate seamlessly into the grid and provide features that not only avoid disruptions, but also can help to actively mitigate disruptions elsewhere on the grid.”

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Three Things You Need to Know About Capital Project Prioritization

“Why do you think these two projects rank so much higher in this method than the first method?” the facilitator asked the director of reliability.

What Is Industrial Maintenance as a Service?

Industrial maintenance as a service (#imaas) transfers the digital and/or manual management of maintenance and industrial operations from machine users to machine manufacturers (OEMs), while improving it considerably.

Three Things You Need to Know About Criticality Analysis

When it comes to criticality analysis, there are three key factors must be emphasized.

Turning the Oil Tanker

This article highlights the hidden trap of performance management systems.

Optimizing Value From Physical Assets

There are ever-increasing opportunities to create new and sustainable value in asset-intensive organizations through enhanced use of technology.

Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022

6 Signs Your Maintenance Team Needs to Improve Its Safety Culture

When it comes to people and safety in industrial plants, maintenance teams are the ones who are most often in the line of fire and at risk for injury or death.