Condmaster Ruby 2016 is more flexible than ever. Delivering significant and user-driven improvements, the new version of this powerful and versatile software has undergone a major design upgrade. In addition, Condmaster Ruby 2016 supports the just-released HD Enveloping® measuring technique and the DuoTech® accelerometer for shock pulse and vibration measurement.

Improved user experience with optimal flexibility and greater efficiency

Powerful usability enhancements provide easy navigation, clear overview and refined visualization of measurement data. A range of flexible features to customize workflows and manage the analysis of condition measurement data gives an efficiency boost to the daily work of engineers and analysts.

Condmaster Ruby 2016 has been given a clean, modern interface, increasing ease of use. Graphic elements with enhanced color and contrast provide good visibility and clarity. The graphical user interface now enables a more personalized appearance of Condmaster windows and displays. With drag and drop functionality, users can easily create a form layout of their own choice and save it as default. A much requested feature is the possibility to “detach” windows from the Condmaster main display, thus enabling quicker navigation between prioritized information as well as the use of multiple computer screens.

In the Spectrum view, each chart and plot can be resized individually. In addition, tool panels can be positioned anywhere within the Spectrum window using drag and drop functionality. Another novelty is the possibility to add trend graphs, spectrums and more as background objects in the Graphical Overview, displaying live updates. The ability to show predefined fault symptoms also in the time domain is a much anticipated feature that is now implemented.

Vibration technician Peter Forsström at the Stora Enso Kvarnsveden paper mill has been instrumental in the further development of the new Condmaster version: “The new spectrum function provides a better overview of measurements, making analysis more efficient. Fewer keystrokes are needed to obtain and display relevant information. The Graphical Evaluation functionality is also enhanced, making it easier to sort out the readings we want to have a closer look at. Both of these functions have been made more user friendly.”

A new installer and changes in Condmaster Ruby Administrator makes installation and initial setup easier than ever. With the new Software Updater, new Condmaster revisions can easily be searched for and installed.

For more information, please contact:

SPM Instrument AB

Telephone +46 (0)152-225 00 or

http://www.spminstrument.com/News/2015/SPM-Instrument-releases-Condmaster-Ruby-2016/

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022

6 Signs Your Maintenance Team Needs to Improve Its Safety Culture

When it comes to people and safety in industrial plants, maintenance teams are the ones who are most often in the line of fire and at risk for injury or death.

Making Asset Management Decisions: Caught Between the Push and the Pull

Most senior executives spend years climbing through the operational ranks. In the operational ranks, many transactional decisions are required each day.

Assume the Decision Maker Is Not Stupid to Make Your Communication More Powerful

Many make allowances for decision makers, saying some are “faking it until they make it.” However, this is the wrong default position to take when communicating with decision makers.

Ultrasound for Condition Monitoring and Acoustic Lubrication for Condition-Based Maintenance

With all the hype about acoustic lubrication instruments, you would think these instruments, once turned on, would do the job for you. Far from it!

Maintenance Costs as a Percent of Asset Replacement Value: A Useful Measure?

Someone recently asked for a benchmark for maintenance costs (MC) as a percent of asset replacement value (ARV) for chemical plants, or MC/ARV%.