Preventing flash over on a Wound Rotor Motor's (WRM) slip rings requires periodic inspection and testing of the rotor's insulation system. The point of the rotor's lowest insulation resistance on a WRM's rotor circuit will almost always be between the exposed metal surface of the slip ring and the rotor shaft. Looking at the typical installation of a WRM it is easy to understand how dirt, carbon dust, and other forms of contamination can build up in the area of the slip rings.

During start-up the high slip between the rotor and the synchronous magnetic field of the stator induces a large amount of energy in the rotor's windings. Lowered insulation resistance due to contamination build up around the rotor leads could easily lead to flash over (arcing between the rings or to ground) and damage the connections between the lead and the rings, the slip rings and possibly even the shaft.

Regular testing of the rotor circuit separate from the resistor bank is recommended to maintain a high level of dependability. Ensure your ground lead is connected to the shaft of the rotor, if possible, to get the most accurate measurement of the resistance between the windings and the shaft of the rotor. While you are at it ensure you closely inspect the slip rings and their insulation for any build up of contamination and clean if necessary.

Tip Provided by PdMA Corporation

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022

6 Signs Your Maintenance Team Needs to Improve Its Safety Culture

When it comes to people and safety in industrial plants, maintenance teams are the ones who are most often in the line of fire and at risk for injury or death.

Making Asset Management Decisions: Caught Between the Push and the Pull

Most senior executives spend years climbing through the operational ranks. In the operational ranks, many transactional decisions are required each day.

Assume the Decision Maker Is Not Stupid to Make Your Communication More Powerful

Many make allowances for decision makers, saying some are “faking it until they make it.” However, this is the wrong default position to take when communicating with decision makers.

Ultrasound for Condition Monitoring and Acoustic Lubrication for Condition-Based Maintenance

With all the hype about acoustic lubrication instruments, you would think these instruments, once turned on, would do the job for you. Far from it!

Maintenance Costs as a Percent of Asset Replacement Value: A Useful Measure?

Someone recently asked for a benchmark for maintenance costs (MC) as a percent of asset replacement value (ARV) for chemical plants, or MC/ARV%.