Align availability and cost management to achieve an acceptable level of risk

Downtime risk aversion is a natural antithesis to cost efficiency in the world of enterprise asset management.

When industrial businesses adopt EAM tools and develop proactive and preventative maintenance strategies, they seek, in theory, to lower operational costs while raising operational excellence. In practice, however, many facilities find these two elements in constant, inextricable contention. In a traditional sense, austere cost-cutting measures only increase a company’s risks because such initiatives usually involve less oversight. Inversely, striving for greater OEE has almost always meant shelling out more resources and increasing opex.

Learn how to visualize your risk profile

Tip provided by 

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
 How To Achieve An Uptime Elements Black Belt

How To Achieve An Uptime Elements Black Belt

Do or do not – there is no try ~ Yoda

Are you one of those people who will not start a project until planning is close to perfect?

The Uptime Elements Black Belt program is designed

...

 Keep the Air Your Machine Breathes Clean and Dry

Keep the Air Your Machine Breathes Clean and Dry

It is important to stop airborne contaminants from entering tanks, drums, or machine reservoirs. The good news is that this is one of the easiest problems to address through high quality

Tip ...

 Optimizing Costs Through RCM-Based O&M

Optimizing Costs Through RCM-Based O&M

Today’s water and wastewater facilities must balance the demands of safety, environment and cost. With shrinking budgets, water and wastewater treatment facilities are asked to do more with

  • ...

How Complex Should Maintenance Procedures Be?

The level of complexity depends on several factors:

  • The complexity of the task. Tasks which have multiple steps that must be performed in specific sequence, or contain unusual operations, must be spelled out precisely.
  • What specific data is needed

...