IMC is set to revolutionize how we think about Asset Management. Happening in Marco Island, Dec 16th - 19th 2024

IMC 2024 is designed to equip you with the knowledge, strategies, and tools needed to lead with foresight and innovation.

Sign Up

Please use your business email address if applicable

The trick to PM optimization (reduction) and proper deployment of predictive maintenance tools is first to know how to categorize the assets, using analysis methods designed to understand likely and costly failure modes. Then with that knowledge, review the existing preventive maintenance procedures. Eliminate those that are either not addressing failure modes or are applied to asset types that don’t observe any time-based pattern. Once these steps are undertaken, the appropriate Predictive Maintenance strategies must be deployed. The result of this optimization of the maintenance program invariably results in a significant reduction in work, with the attendant reduction in labor and spare parts usage. In turn, these results drive significant cost savings and enhanced asset performance.

Tip by: Steve Thomas and Robert DiStefano
Co-Authors Asset Data Integrity Is Serious Business (Industrial Press)

ChatGPT with
ReliabilityWeb:
Find Your Answers Fast
Start