FREE copy of the Uptime Elements Implementation Guide once you subscribe to Reliability Weekly

Your journey starts at the Virtual Reliability Leadership Development Summit

Smith and Mobley (2008) highlight the following types of asset management strategies that may be developed from an RCM process.

1. Condition based tasks. E.g. Oil is sampled from a transformer and the results of the analysis determine if further maintenance is required.

2. Scheduled restoration. E.g. A Sheave bank running in a corrosive environment that requires overhaul at fixed intervals.

3. Scheduled Discard. E.g. The replacement of oil in a combustion engine.

4. Failure finding task. E.g. Calibration of instrumentation. The fault may not be discovered until the calibration is done.

5. One-time change. Typically a one off redesign.

Tip excerpted from Tools for Improving Maintenance strategies and failure analysis processes by Mark Brunner

banner
A weekly collection of recommended articles and videos to boost your reliability journey. Right in your inbox
DOWNLOAD NOW

Upcoming Events

August 7 - August 10, 2023

MaximoWorld 2023

Rapid Review - Formerly CRL 4-Hour Fundamental

Uptime Elements Reliability Leadership Rapid Review Course

View all Events