IMC is set to revolutionize how we think about Asset Management. Happening in Marco Island, Dec 16th - 19th 2024

IMC 2024 is designed to equip you with the knowledge, strategies, and tools needed to lead with foresight and innovation.

Sign Up

Please use your business email address if applicable

Smith and Mobley (2008) highlight the following types of asset management strategies that may be developed from an RCM process.

1. Condition based tasks. E.g. Oil is sampled from a transformer and the results of the analysis determine if further maintenance is required.

2. Scheduled restoration. E.g. A Sheave bank running in a corrosive environment that requires overhaul at fixed intervals.

3. Scheduled Discard. E.g. The replacement of oil in a combustion engine.

4. Failure finding task. E.g. Calibration of instrumentation. The fault may not be discovered until the calibration is done.

5. One-time change. Typically a one off redesign.

Tip excerpted from Tools for Improving Maintenance strategies and failure analysis processes by Mark Brunner

ChatGPT with
ReliabilityWeb:
Find Your Answers Fast
Start