FREE copy of the Uptime Elements Implementation Guide once you subscribe to Reliability Weekly

Your journey starts at the Virtual Reliability Leadership Development Summit

Construction to Maintenance- A Case Study in Transition of Facilities Management Data

IMC-2016 Learning Session - 41:16 
by Dennis Ford, Texas Children's Hospital; Evan Kontos, Drawbase Software; David Connors, Drawbase Software

This session is design to review the process and requirements a healthcare facility owner employed to migrate a newly constructed patient facility thru the entire lifecycle building and management process. The owner of a new 1 million square foot hospital leveraged key program planning process management techniques to ensure that the graphic floorplans, equipment and building infrastructure data captured during the facility design and construction phase from various design and engineering consultants ensured that this new healthcare facility would be Joint Commission Environment of Care (EOC) survey ready on day one. This included data needed to ensure a smooth transition from construction to operations and maintenance. The data was defined during design, standardized during construction, and used during commissioning. This formed the basis of a building information management (BIM) system. This includes integrations with CAFM and EAM solutions including Maximo to ensure a complete integrated management solution to support on-going facility planning and maintenance management requirements.

banner
A weekly collection of recommended articles and videos to boost your reliability journey. Right in your inbox
DOWNLOAD NOW

Upcoming Events

August 7 - August 10, 2023

MaximoWorld 2023

Rapid Review - Formerly CRL 4-Hour Fundamental

Uptime Elements Reliability Leadership Rapid Review Course

View all Events