IMC is set to revolutionize how we think about Asset Management. Happening in Marco Island, Dec 16th - 19th 2024

IMC 2024 is designed to equip you with the knowledge, strategies, and tools needed to lead with foresight and innovation.

Sign Up

Please use your business email address if applicable

A graphical project management technique that shows the time taken by each component of a project, and the total time required for its completion. The program evaluation and review technique (PERT) breaks down the project into events and activities, and lays down their proper sequence, relationships, and duration in the form of a network. Lines connecting the events are called paths, and the longest path resulting from connecting all events is called the critical path. The length (duration) of the critical path is the duration of the project, and any delay occurring along it delays the whole project.

Tip excerpted from: The Professional's Guide to Maintenance and Reliability Terminology by Ramesh Gulati, Jerry Kahn and Robert Baldwin

The Professional's Guide Book Image

ChatGPT with
ReliabilityWeb:
Find Your Answers Fast
Start