When establishing an effective maintenance program, one must determine not only which Preventive Maintenance (PM) routines to accomplish, but how often should they be done. The answer to this question would seem on the surface to be quite simple and, in fact, one proven theory is that the PM to Corrective Maintenance (CM) work order ratio should be about 6 to 1. This theory assumes that the PM inspections should reveal some type of corrective work that should be completed on an asset on average every 6 times it is accomplished. The assumption is that, if the ratio is greater than 6:1 you are performing the PM too often; if the ratio is less then 6:1, you are not performing it often enough. (The "6 to 1 Rule", proven by John Day, Jr., Manager of Engineering and Maintenance at Alumax of South Carolina, during the period when Alumax of South Carolina was certified as the first "World-Class" maintenance organization).

Tip provided by Life Cycle Engineering
http://www.lce.com

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
 How To Achieve An Uptime Elements Black Belt

How To Achieve An Uptime Elements Black Belt

Do or do not – there is no try ~ Yoda

Are you one of those people who will not start a project until planning is close to perfect?

The Uptime Elements Black Belt program is designed

...

 Keep the Air Your Machine Breathes Clean and Dry

Keep the Air Your Machine Breathes Clean and Dry

It is important to stop airborne contaminants from entering tanks, drums, or machine reservoirs. The good news is that this is one of the easiest problems to address through high quality

Tip ...

 Optimizing Costs Through RCM-Based O&M

Optimizing Costs Through RCM-Based O&M

Today’s water and wastewater facilities must balance the demands of safety, environment and cost. With shrinking budgets, water and wastewater treatment facilities are asked to do more with

  • ...

How Complex Should Maintenance Procedures Be?

The level of complexity depends on several factors:

  • The complexity of the task. Tasks which have multiple steps that must be performed in specific sequence, or contain unusual operations, must be spelled out precisely.
  • What specific data is needed

...