Level Up Your Reliability Skills: Get Certified! Boost your career now!

Elevate your industry profile at The RELIABILITY Conference.

Sign Up

Please use your business email address if applicable

When establishing an effective maintenance program, one must determine not only which Preventive Maintenance (PM) routines to accomplish, but how often should they be done. The answer to this question would seem on the surface to be quite simple and, in fact, one proven theory is that the PM to Corrective Maintenance (CM) work order ratio should be about 6 to 1. This theory assumes that the PM inspections should reveal some type of corrective work that should be completed on an asset on average every 6 times it is accomplished. The assumption is that, if the ratio is greater than 6:1 you are performing the PM too often; if the ratio is less then 6:1, you are not performing it often enough. (The "6 to 1 Rule", proven by John Day, Jr., Manager of Engineering and Maintenance at Alumax of South Carolina, during the period when Alumax of South Carolina was certified as the first "World-Class" maintenance organization).

Tip provided by Life Cycle Engineering
http://www.lce.com

“R.A.I.” the Reliability.aiTMChatbot

You can ask "R.A.I." anything about maintenance, reliability, and asset management.
Start

Upcoming Events

MaximoWorld

August 5 - 8, 2024
View all Events