(Specifics are from US rules. In the US follow OSHA 1926.500-3 and ANSI Z359 standards)

Retractors (SRL's, Retractable Lanyards, Self-Retracting Lifelines) -use OEM frequency by maintenance or tool crib attendant

Inspect retractors per OEM recommendations. Never use any lubrication. In adverse conditions (chemical plants, refineries, ship yards, etc.) replace retractors annually. Perform function tests quarterly and use flashlight to inspect where webbing is attached to drum in retractor. Pull out all the way to see drum.

If retractors have been subjected to a fall or shows cable wear, snaphook damage or loss of label legibility they should be replaced immediately.

In benign environments perform function tests quarterly and budget for replacement every 5 years.

Do not disassemble or service inside of retractor unless trained by OEM or certified. Consider marking the date into service on the retractors in indelible marker to be able to quickly see if it is outdated.

Attachment (anchorage) Points -inspected annually by a trained fall protection qualified inspector. Inspect annually for corrosion, distortion, twisting and broken welds (some manufacturers recommend 6 month intervals). In addition inspect after any fall arrest incident. A log of all attachment points and specific locations should be kept.

Webbing- Daily by Operations
Inspect webbing using the standards for slings. No cuts, pulls, chemical spills or weld splatter. Do not repair- replace if damaged.

Harnesses - daily by operations
Inspect using the standards for slings. No cuts, tears, chemical spills or weld splatter. Do not repair -discard if damaged. Otherwise replace every 5 years.

Wire rope- daily by Operations
Inspect wire rope using the standards for hoist cable. Look for kinks, broken strands, rust, damaged thimbles. Use flashlight to inspect where wire rope is attached to drum in retractor then return for maintenance. Pull out all the way to see drum; look for damage. Do not bend rope to inspect. Note: there should be a two cable wrap around the drum when the device is purchased.

Inspect wire rope catenaries where attached (critical inspection- look closely) and look for kinks, broken strands, rust. Do not bend rope to inspect. Be alert if acids or caustics are used and look for accelerated deterioration. Do not repair- replace if damaged. If catenaries show signs of stretching replace them also. Catenaries should be slightly loose and not pulled tight. All catenaries (designed as engineered horizontal lifelines) must be designed by a registered Professional Engineer in the USA (1926.502(d)(8))

Temporary railings and barriers. Weekly by safety, operations or maintenance

Should be checked weekly for bending, weld breakage, looseness, corrosion. Follow established rules for height, density and strength. Should not move 3" at 200 lbs (OSHA 1926.502) applied outwards and downwards

Hooks and attachment devices -daily by operations
Check for distortion or gate looseness. Only use Z359.12 compliant snap hooks with 3600 lbs gate strength
Inspect using the standards for hoist hooks. No distortion or rust. Insure good attachment to webbing or wire rope.

Tip provided by: Joel Levitt and J. Nigel Ellis, PhD
Joel Levitt is president of Springfield Solutions and is the author of several maintenance reliability books available at MRO-Zone Bookstore.

Dr. Ellis is president of Ellis Fall Safety Solutions and is a leading expert in fall protection and can be reached at efss@fallsafety.com

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
“Steel-ing” Reliability in Alabama

A joint venture between two of the world’s largest steel companies inspired innovative approaches to maintenance reliability that incorporate the tools, technology and techniques of today. This article takes you on their journey.

Three Things You Need to Know About Capital Project Prioritization

“Why do you think these two projects rank so much higher in this method than the first method?” the facilitator asked the director of reliability.

What Is Industrial Maintenance as a Service?

Industrial maintenance as a service (#imaas) transfers the digital and/or manual management of maintenance and industrial operations from machine users to machine manufacturers (OEMs), while improving it considerably.

Three Things You Need to Know About Criticality Analysis

When it comes to criticality analysis, there are three key factors must be emphasized.

Turning the Oil Tanker

This article highlights the hidden trap of performance management systems.

Optimizing Value From Physical Assets

There are ever-increasing opportunities to create new and sustainable value in asset-intensive organizations through enhanced use of technology.

Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022