"Focusing an organization's efforts is the only way to achieve and maintain success"

Guiding Principles are principles an organization must follow in order to be successful in any area where there may not be proper alignment. Planning and scheduling will never be effective without the alignment of Production, Maintenance, and Engineering. Guiding Principles keeps an organization focused and the success of planning and
scheduling hinges on these principles.

Planning and Scheduling Guiding Principles are developed together with leadership in Production, Maintenance, Maintenance Planning, Maintenance Scheduling, Reliability Engineering, Maintenance Engineering, and Project Engineering. Developing these principles together as a team allows an organization to be aligned in their efforts and ensure success of Maintenance Planning and Scheduling.

Planning Guiding Principles

• All "critical" work will have effective work procedures developed.
• All PMs/PdMs (not regulatory) must address specific failure modes.
• Planners focus only on future work.
• Bill of Materials must be developed for all Critical Equipment.
• Production and Maintenance must be aligned in the planning process:
o Roles and Responsibilities
o Expectations
o Metrics
• Jobs not previously planned will be "scoped" by the maintenance technician and the planner.

Scheduling Guiding Principles

• Planned Jobs must have all parts on site and kitted before being scheduled.
• Availability of equipment must be communicated to maintenance at least 7 days in advance.
• Perform an after-action review on any shutdown over 4 hours applying the 2 up / 2 down Rule

2 Up/ 2 Down Rules states: "when performing an after action review only focus on 2 items we did well and must sustain and,
2 areas we need to improve the next time"


• Manage the backlog:
o Total
o Ready to Schedule
o Waiting Parts

We hope our latest edition of our book "Planning and Scheduling Made Simple" can be helpful, simple, and to the point. Please send us your comments, questions, and suggestions for topics to cover in the future. You can contact us at: Jerry Wilson, jerrywilson@ffcmail.com and Ricky Smith, CMRP, rsmith@gpallied.com

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
“Steel-ing” Reliability in Alabama

A joint venture between two of the world’s largest steel companies inspired innovative approaches to maintenance reliability that incorporate the tools, technology and techniques of today. This article takes you on their journey.

Three Things You Need to Know About Capital Project Prioritization

“Why do you think these two projects rank so much higher in this method than the first method?” the facilitator asked the director of reliability.

What Is Industrial Maintenance as a Service?

Industrial maintenance as a service (#imaas) transfers the digital and/or manual management of maintenance and industrial operations from machine users to machine manufacturers (OEMs), while improving it considerably.

Three Things You Need to Know About Criticality Analysis

When it comes to criticality analysis, there are three key factors must be emphasized.

Turning the Oil Tanker

This article highlights the hidden trap of performance management systems.

Optimizing Value From Physical Assets

There are ever-increasing opportunities to create new and sustainable value in asset-intensive organizations through enhanced use of technology.

Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022