Yes to both questions!

* Planning prevents delays by indentifying the needs of the job

* Planning enables Scheduling, by quantifying the resource needs in order for a block of time to be set aside to do the job

* Scheduling enables effectiveness by maximizing resource utilization in both Maintenance and Production

* Scheduling alone can improve effectiveness with only an estimate of labor needs by reducing the downtime between maintenance jobs, eliminating false starts when Production can't free up the equipment, and by reducing the downtime when Maintenance has to wait while Production shuts down and prepares equipment

* Together Planning and Scheduling are more effective on certain jobs

* Not all jobs are candidates for Planning or Scheduling

Tip excerpted from Planning & Scheduling Made Simple by Ricky Smith & Jerry Wilson

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
 How To Achieve An Uptime Elements Black Belt

How To Achieve An Uptime Elements Black Belt

Do or do not – there is no try ~ Yoda

Are you one of those people who will not start a project until planning is close to perfect?

The Uptime Elements Black Belt program is designed

...

 Keep the Air Your Machine Breathes Clean and Dry

Keep the Air Your Machine Breathes Clean and Dry

It is important to stop airborne contaminants from entering tanks, drums, or machine reservoirs. The good news is that this is one of the easiest problems to address through high quality

Tip ...

 Optimizing Costs Through RCM-Based O&M

Optimizing Costs Through RCM-Based O&M

Today’s water and wastewater facilities must balance the demands of safety, environment and cost. With shrinking budgets, water and wastewater treatment facilities are asked to do more with

  • ...

How Complex Should Maintenance Procedures Be?

The level of complexity depends on several factors:

  • The complexity of the task. Tasks which have multiple steps that must be performed in specific sequence, or contain unusual operations, must be spelled out precisely.
  • What specific data is needed

...