I have often compared the use of KPI's with the fairytale "The Emperor's New Clothes" by Hans Christian Andersen. In short, the fairy tale is about two weavers who promise an emperor a new suit of clothes that is invisible to those unfit for their positions, stupid, or incompetent. One day the emperor parades in the town before his subjects in his new clothes, a child cries out, "But he is naked!" Then all people admitted and said the same thing. Before the child said it no one wanted to admit they were stupid or incompetent.

So what does this have to do with the use of KPIs?

I have done so many audits in plants and mills and very often come across boards posted with KPIs such as: Schedule compliance, Maintenance cost, Preventive Maintenance compliance, Backlog hours, Availability and many more. There is nothing wrong in these KPIs but when you look deeper into how they are produced and how they are used by the organization you often find they are not used at all to drive performance or they are based on very poor input information.

Ask the questions "Where does the data come from and how do we use each KPI?" Often the answer is that "Martin put these together on a weekly basis, because we have been told to do so, but they do not mean anything to us, we do not understand them and do not use them".

In a situation like this somebody should say that it is a waste of time to produce and publish all these reports and propose what KPIs should be used instead.

I would propose to divide the KPIs in leading and lagging indicators. The leading indicators such as Preventive Maintenance (PM) compliance, Schedule compliance, Break in work etc. are actions you take to impact the lagging indicators that include Reliability and Cost.

I would also propose to never use more than three leading KPIs at a time and to match these with the improvement initiatives you are working on. When you have improved on these initiatives and stabilized that performance you move to the next indicator(s).

In a very reactive organization it is a waste to measure schedule compliance because you do most probably not have a reliable schedule to measure compliance against. To change the performance to more planned, scheduled, and controlled you most probably have to improve two things: use of priorities and preventive maintenance. After you agree on a guideline for how to set priorities on work (I be happy to send examples to you) you should measure the percent of "break in work" in schedules. The fact is that if you have too much "break in work" you will always remain reactive. PM compliance would be the next step and you must be certain that the PM program content is right before you measure PM compliance. When you execute the right PM with 90% + compliance and you reduced your "break in work" to less than 10% in daily schedules you are ready to measure schedule compliance. When schedule compliance is 90%+ for daily schedules your organization is stabilized and ready for continued improvement. Now you can move to measure: % planned work in schedules, vibration trend, how time is used and backlog trend. Precision planning and scheduling would be next.

KPI image

Tip Provided By: Christer Idhammar, Founder and CEO IDCON, INC.

idcon logo

Christer Idhammar (info@idcon.com) is a world-renowned and multi award winning Reliability and Maintenance Consultant and Guru. He is the Founder and CEO of IDCON INC in Raleigh NC, USA; A reliability and maintenance training and consulting company to the Pulp and Paper Industry worldwide since 1972. www.idcon.com

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
 How To Achieve An Uptime Elements Black Belt

How To Achieve An Uptime Elements Black Belt

Do or do not – there is no try ~ Yoda

Are you one of those people who will not start a project until planning is close to perfect?

The Uptime Elements Black Belt program is designed

...

 Keep the Air Your Machine Breathes Clean and Dry

Keep the Air Your Machine Breathes Clean and Dry

It is important to stop airborne contaminants from entering tanks, drums, or machine reservoirs. The good news is that this is one of the easiest problems to address through high quality

Tip ...

 Optimizing Costs Through RCM-Based O&M

Optimizing Costs Through RCM-Based O&M

Today’s water and wastewater facilities must balance the demands of safety, environment and cost. With shrinking budgets, water and wastewater treatment facilities are asked to do more with

  • ...

How Complex Should Maintenance Procedures Be?

The level of complexity depends on several factors:

  • The complexity of the task. Tasks which have multiple steps that must be performed in specific sequence, or contain unusual operations, must be spelled out precisely.
  • What specific data is needed

...