IMC-2017 Learning Session 50:16
-Jacobs NASA- by Michael Stites, Jacobs Engineering.

In the era of “constrained budgets,” strategies to decrease maintenance program costs yet increase critical system reliability and availability are more important than ever. A robust Preventive Maintenance (PM) approach is required to maintain the assets and deliver a meaningful level of reliability. However, performing too much PM can be costly beyond their direct costs (labor, materials, equipment, etc.) as many are highly invasive procedures which can disrupt and disturb stable systems resulting in unplanned downtime.

In 2012, Jacobs took the initiative to develop key maintenance strategies for NASA Langley Research Center (NASA LaRC) – a 788-acre campus of over 270 buildings and other national assets including several large wind tunnels which provide subsonic to hypersonic speed aeronautic testing. Finding our proposal compelling, NASA provided strategic investment funding for three consecutive years to implement real-time condition based monitoring (CBM) of critical assets and systems. In addition to physical asset monitoring, our comprehensive solution included everything from applying fundamental RCM principles and processes to designing and operating a 24/7/365 Integrated Operations Center. Our Jacobs holistic approach enabled early identification and prevention of catastrophic failures; increased the useful life of plant equipment; optimized maintenance intervals; increased worker safety; and lowered disruptions to normal operations by performing CBM. In fact, we have enhanced system reliability to the point that NASA LaRC has not experienced a single, unplanned asset failure on CBM monitored assets since 2015!

After implementation, the overall cost of maintenance also decreased significantly – a savings of $5.3M over three years.

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
Project Planning and Management for Asset Recapitalization and Enhancement with Maximo

Project Planning and Management for Asset Recapitalization and Enhancement with Maximo

Being part of an O&M organization means not only dealing with the day-to-day asset maintenance but planning for the recapitalizations and enhancements that will keep the capabilities of the facility current for years to come.

I Need Reliability, but How Do I Talk to My Senior Leaders?

I Need Reliability, but How Do I Talk to My Senior Leaders?

Not managing your assets to deliver true reliability? How do you get started and get Senior Leaders engaged in the effort?

Framatome's Innovative Use of Maximo to Support the Nuclear Power Industry

Framatome's Innovative Use of Maximo to Support the Nuclear Power Industry

Framatome is an international leader in nuclear energy recognized for its innovative solutions and value-added technologies for the global nuclear fleet.

A Robust Framework for Risk Management

A Robust Framework for Risk Management

Asset management is the coordinated activities of an organization to realize value from assets. Guidance in asset management can be found in the ISO 5500X series of international standards.