IMC-2020 Presentation 36:05 Minutes

by Abdul Alami, Jetek Engineering Corporation

State-of-the-art (innovated) maintenance management is not to repair broken equipment rapidly. Smart maintenance management is to keep the equipment running at high capacity with the lowest operation and maintenance cost possible. This will not happen if there is no innovative approach.

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
How To Reduce Reactive Work With Oracle Maintenance Solutions

How To Reduce Reactive Work With Oracle Maintenance Solutions

Studies show that a reactive maintenance job can cost 3 to 5 times as much as a planned and scheduled maintenance job. Many companies are struggling to transition from a Reactive maintenance operation to a Planned and Proactive operation.

Reliabilitytalk Coffee Break: EAM Masters Jay West and Israel Anderson, hosted by Terrence O'Hanlon.

Reliability Critical Motor Program

Reliability Critical Motor Program

Challenges: One of the biggest challenges is being able to recognize, diagnose and remedy an evolving motor problem to prevent an unexpected catastrophic event.

Right 10 Manage for Reliability: The 10 Rights of Asset Management

Right 10 Manage for Reliability: The 10 Rights of Asset Management

"When I talk to a manager, I get the feeling that they are important. When I talk to a leader, I get the feeling that I am important." Author Ramesh Gulati talks about Right 10, Manage it Right. The right people, the right robust process, the right breakthrough technology. 18:31 Minutes

Right 9 Dispose and Decommission for Reliability: The 10 Rights of Asset Management

Right 9 Dispose and Decommission for Reliability: The 10 Rights of Asset Management

Clutter hazards, environmental sustainability, safety, security (data) all part of Right 9 Dispose Decommission 1:45 Minutes