Failed part, failure mode, failure code, failure cause

Accurate Work Order Close Out is important for the continuous improvement of any organization.

The objective of accurate data collection is to assist management in making the right decisions at the right time and to empower workers to make decisions at the floor level.

General Rules:

Work Orders should have at the minimum the:Fig. 3

1. All work is covered by a work order
2. The Correct Work Order Code (breakdown (1), urgent (2), etc.)
3. The Correct Equipment Number, at the Right Level
4. The maintenance person's accurate total work hours charged to this work order
5. The start time and completed time on the job
6. Comments from the maintenance person as to what work was performed
7. Any recommendation to changes to maintenance strategy or procedure
8. Any parts used whether from the storeroom or not
9. The maintenance person's signature.

WARNING: Without the above information one cannot determine;

• Actual maintenance cost for specific assets
• Mean Time Between Failure
• Mean Time To Repair
• Mean Time Between Repairs
• Rework
• If a PM Procedure is effective
• If a specific type repair is effective
• If a maintenance strategy meets the intent of the end users

10. Repair or Corrective Work orders must include everything as stated above plus

a. component code
b. failure code
c. Cause code.

11. Without the previously stated information one cannot determine the;

a. Dominant Failure Thread - which component has the most specific failure modes with a specific cause across multiple assets

Fig. 1

b. Dominant Failure Pattern - which failure pattern is the most dominant and what are the major causes of failures for this pattern. This allows one to develop strategies to eliminate unacceptable failures which impact the organization.

Fig. 2

WARNING: Without the above information one cannot determine;

a. The Component (across area, plant, etc) with the most failures
b. The most frequent Failure Mode for the most frequently failed component
c. The Component "Cause" for the majority of these failures.
d. Pareto Causes of Failures in most "Dominant Failure Pattern"

"In the absence of quality data we have reactivity"

Just a Thought!

Tip provided by Ricky Smith of GP Allied. If you have questions or suggested topics send an email to rsmith@gpallied.com

Reference: ISO 14224

Upcoming Events

August 9 - August 11 2022

MaximoWorld 2022

View all Events
banner
80% of Reliabilityweb.com newsletter subscribers report finding something used to improve their jobs on a regular basis.
Subscribers get exclusive content. Just released...MRO Best Practices Special Report - a $399 value!
DOWNLOAD NOW
“Steel-ing” Reliability in Alabama

A joint venture between two of the world’s largest steel companies inspired innovative approaches to maintenance reliability that incorporate the tools, technology and techniques of today. This article takes you on their journey.

Three Things You Need to Know About Capital Project Prioritization

“Why do you think these two projects rank so much higher in this method than the first method?” the facilitator asked the director of reliability.

What Is Industrial Maintenance as a Service?

Industrial maintenance as a service (#imaas) transfers the digital and/or manual management of maintenance and industrial operations from machine users to machine manufacturers (OEMs), while improving it considerably.

Three Things You Need to Know About Criticality Analysis

When it comes to criticality analysis, there are three key factors must be emphasized.

Turning the Oil Tanker

This article highlights the hidden trap of performance management systems.

Optimizing Value From Physical Assets

There are ever-increasing opportunities to create new and sustainable value in asset-intensive organizations through enhanced use of technology.

Conducting Asset Criticality Assessment for Better Maintenance Strategy and Techniques

Conducting an asset criticality assessment (ACA) is the first step in maintaining the assets properly. This article addresses the best maintenance strategy for assets by using ACA techniques.

Harmonizing PMs

Maintenance reliability is, of course, an essential part of any successful business that wants to remain successful. It includes the three PMs: predictive, preventive and proactive maintenance.

How an Edge IoT Platform Increases Efficiency, Availability and Productivity

Within four years, more than 30 per cent of businesses and organizations will include edge computing in their cloud deployments to address bandwidth bottlenecks, reduce latency, and process data for decision support in real-time.

MaximoWorld 2022

The world's largest conference for IBM Maximo users, IBM Executives, IBM Maximo Partners and Services with Uptime Elements Reliability Framework and Asset Management System is being held Aug 8-11, 2022