There was a terrible fire in a liquefied petroleum gas (LPG) plant. It destroyed piping and a critical air cooler (fin fan) and damaged pumps, valves, cables and supports. Fortunately, although there were injuries, no one died.
A large water utility decided to investigate maintenance reliability best practices. There were eight different treatment plants and eight different maintenance managers.
A week after the plant started up after an annual planned outage, an injection pump motor failed. The motor’s insulation had failed, shorting between phases.
We worked with Newark Airport, NJ, testing lube samples from ground service vehicles. For years, results were unremarkable until, during cold months, gasoline engines showed elevated abrasives with corresponding Fe (iron) wear and Si (silicon), an indicator of abrasives.
A large water utility decided to develop and implement a corporate risk management program that could identify and manage the top twenty-five risks across the organization considering three focus areas: corporate, operational and asset risks.
Skookum maintains infrastructure and equipment across twenty national sites and is committed to providing customers with higher reliability and enabling their asset management program. These objectives require quality asset information to improve maintenance outcomes, make repair versus replace decisions, and drive the cost curve lower.
In 2006, British mathematician Clive Humby famously stated that “data is the new oil,” recognizing that the transformation of data into useful information would become a global driver of economic growth.
It was a dark and stormy night as we sat around the conference table discussing the best way to arrange the grid connection of the company’s new wind farm that was in design. Everyone was friendly, but it was a feisty conversation.
Research published by Harvard Business Review indicates that 60-70% of change initiatives do not succeed, primarily due to employee resistance and lack of management support.
At 2:37 a.m. one Tuesday morning, an electrical fault inside a motor control center (MCC) room caused roughly ten hours of downtime. The E&I supervisor was called in and the maintenance manager was notified.
Risk-based asset condition management programs have been around for years now, and have been a vital part of LOOP’s success in our quest for operational excellence.
ChatGPT with ReliabilityWeb: Find Your Answers Fast