The RELIABILITY Conference: 2 Days of Learning, Networking and Reliability Excellence

The RELIABILITY Conference® : TRAIN & TRANSFORM

Sign Up

Please use your business email address if applicable

Articles

Value Stream Mapping as a Tool for Waste Time Elimination: A Case Study

Value Stream Mapping as a Tool for Waste Time Elimination: A Case Study

One lean manufacturing tool used to eliminate non-added-value activities in production lines is value stream mapping (VSM). VSM identifies wastage of resources and eliminates or reduces them to improve productivity. VSM clearly shows the ineffectiveness of action, measures the waste level and supports in designing the appropriate changes, independently and economically.

Are You Educating with Your Reliability Reports?

There are two ways to write reliability reports. One is to write to educate. The other is to write to train. The difference between educating and training is vast.

Maintenance Rebuild Decision: Reuse or Replace

Maintenance Rebuild Decision: Reuse or Replace

An often debated subject on maintenance rebuilds is exactly which parts or components should be replaced. There are two extremes when making this decision. There is a balance in replace or reuse to achieve the proper reliability and cost balance. This article will give some considerations around decisions to reuse or replace when executing maintenance.

Data Centers and Fluid Condition Monitoring: Overview

Data Centers and Fluid Condition Monitoring: Overview

Many of our activities, memories and ideas are stored in an ethereal space called a Cloud, but what is the Cloud? Where is it? And what implications does it have on a global level?

banner
A weekly collection of recommended articles and videos to boost your reliability journey. Right in your inbox
DOWNLOAD NOW
Avoid DOWNTIME: Write Standard Operating Procedures

Avoid DOWNTIME: Write Standard Operating Procedures

Write standard operating procedures (SOPs) to drive maximum efficiency on the manufacturing floor, in the restaurant, across the school campus, in the warehouse and in the fleet. Implement SOPs and regulatory checklists to ensure your operations are consistent across your company and to streamline business processes.

Keeping Critical Production Assets Running

Keeping Critical Production Assets Running

Pieridae Energy is Canada’s only independent, publicly-traded LNG company, focused on developing the multi-billion Goldboro LNG Project and export facility off Canada’s East Coast, supplied with Canadian natural gas that the company owns. Prior to the project, Pieridae Energy's existing system was not able to manage nor meet all of their operations and maintenance processes.

Does High Voltage Testing Damage A Motor?

Motor Insulation Life Curve

Maintenance professionals tasked with maintaining electric motor reliability are often concerned with testing their critical motors at voltages well above nameplate levels. It can certainly feel counterintuitive to test a 460V motor to 2,000V or a 4,160V motor to 9,320V. After all, the motor is only rated for this lower voltage, right?

Q&A with Stéphane Côté of Bentley Systems

Q&A with Stéphane Côté of Bentley Systems

Uptime® magazine recently met with Stéphane Côté, Fellow and Research Director in Bentley Systems’ Applied Research Group. Côté’s work explores the potential of augmented reality in the context of infrastructure engineering. Last spring, he and his team experimented with Microsoft® HoloLensTM, an augmented reality device that will shape how all of us will work going forward. Côté talked with us about the HoloLens itself, the benefits of implementing it, and much more.

Featured Reliability Leader: Anthony “Mac” Smith

Featured Reliability Leader: Anthony “Mac” Smith

Uptime® magazine recently had the pleasure to speak with reliability-centered maintenance (RCM) pioneer and expert, Anthony “Mac” Smith. Terrence O’Hanlon, Publisher, sat down with Mac to discuss his life and the career that led him to be recognized as one of the early leaders and advocates for RCM. The complete video interview is available at the end of the Q&A.

A Risk Threshold Investigation Is Born

This article takes you through the birth of RTI, explaining what RTI is, why it was created, where it fits into a maintenance reliability program strategy, how it is conducted and showing it in action with some actual results.

Managing the Risk of the Schedule Using Monte Carlo Simulations

Managing the Risk of the Schedule Using Monte Carlo Simulations

Consider this scenario: You are finalizing the planning of your company’s next major maintenance outage or capital project and are concerned the timeline is too tight and your team is small. You communicate this to management and... 

Becoming a High Reliability Organization Through Defect Elimination

Becoming a High Reliability Organization Through Defect Elimination

High reliability organizations (HRO) are those that effectively manage risks by identifying and controlling probability and consequence.