Defects occur at specific frequencies in relationship to the running speed of the equipment. Most vibration analysis software will allow these specific frequencies (bands) to be measured and
One of the Pillars of TPM is the Elimination of Minor Stoppages. These are the annoying "glitches" or "hiccups" in the routine operation of the equipment. Experienced equipment operators know how
The process of identifying maintenance of significant items and classifying them with respect to malfunction on safety, enviornmental, operational, and economic consequences. The possible
Almost all vibration data collectors, analyzers or software have an option to select the "window type" to use for a particular measurement. In short, when sampling and digitizing vibration data,
...
A weekly collection of recommended articles and videos to boost your reliability journey. Right in your inbox
Being successful here quickly identifies success in many other processes and KPIs. Let's be clear - 100% of available maintenance man-hours must be scheduled. Some organizations plan for
When used oil analysis and/or Direct Reading Ferrographs indicate abnormal wear, Analytical Ferrography is an excellent test to identify the type of wear occurring and the source of wear.
When failures occur, it is usually first recognized at the equipment level by operating or production units (should personnel be mentioned instead of units?). When a malfunction takes place, if
Someone comes in to your facility with an infrared camera to make measurements through an IR window. How do you know the camera will work with your Infrared window?
When is a work order truly complete? There's more to work order completion than simply performing the actual maintenance tasks and changing the WO status to "Complete" within the CMMS/SAP.
I have spend the last 22 years in maintenance, operations and quality. When I looked back I noticed that I became a different maintenance manager after an assignment in operations. By now it is
The monetary value that would be required to replace the production capability of the present assets in the plant. Includes production or process equipment, as well as utilities, support, and.
I have a simple tip that always saves me time. When making measurements, place a piece of white electrical tap on the side of the tape measurer, each time you take a measurement write it down