The RELIABILITY Conference: 2 Days of Learning, Networking and Reliability Excellence

International Maintenance Conference 2025: The Speed of Reliability

Sign Up

Please use your business email address if applicable

reliability engineering for maintenance

Reciprocating Pumps: System Modification for Maintenance Improvement

Reciprocating Pumps: System Modification for Maintenance Improvement

System modification is an economically viable option to restore mechanical integrity, achieve optimum operation and reduce maintenance costs. This is realized through the development of a system modification program for a reciprocating pump with recurring leakage failures.

How to Know If an Inspection Is Technically Feasible

How to Know If an Inspection Is Technically Feasible

The SAE International standard for reliability-centered maintenance (RCM)1 says an inspection2 should be done if it is technically feasible and worth doing. The hard part is identifying when a task is technically feasible.

Setting up the Calendar for Maintenance Training

Watch this video tip from Jeff Shiver, Managing Principal at People and Processes

banner
A weekly collection of recommended articles and videos to boost your reliability journey. Right in your inbox
DOWNLOAD NOW

Pressure Sensor Diaphragm

A typical pressure sensor consists of a pressure-retaining housing containing a diaphragm that is slightly moved by changes in fluid pressure. Some form of electronic device is mounted to the

...

Ready Steady Gone – Maintenance Initiatives

Many organizations are keen or feel pressured to make substantial improvements to the Maintenance and Reliability practices and they quickly set off on doing so. They have quickly reached the

Tip ...

The Cultural Shift That Can Save Lives

The Cultural Shift That Can Save Lives

An interesting statistic reveals that 65 percent of the American population feels certain they are better at math than half the general population. While both ironic and funny, it is also quite telling of how people naturally tend to overestimate the likelihood of positive outcomes compared to less desirable results. It is simply human nature to hope for the best outcome. For the most part, there is no real harm in believing one’s math skills are better than they really are. But, when you overestimate the reliability of equipment that you count on every day to perform your various jobs, the results are not just surprising – they can be dangerous.

Without Failure Data All You Have is a Work Order Ticket System

Without Failure Data All You Have is a Work Order Ticket System

The RELIABILITY Conference - 38:21 
by John Reeve, Total Resource Management

More specifically, without failure modes all you have is a bunch of codes. This may be the most overlooked data element, as most CMMS products do NOT capture the failure mode. This critical data element allows one to (1) derive the ideal maintenance task, (2) quickly compare work order (WO) failure modes with RCM analysis failure modes, and, (3) support drill-down on asset worst offenders for basic failure analysis. Failure data, failure analysis and failure prevention are all part of an integrated process, which helps the reliability team continuously, improve – using the CMMS. Attend this presentation for practical solutions to a common challenge.

Photography for Maintenance Activities

Photography for Maintenance Activities

The RELIABILITY Conference – 52:28
by Paul Crocker, Kansas City Board of Public Utilities

Sometimes I need more information on an Asset than what is readily available. In those instances I’ll give a camera to one my staff and ask them to get photos of what I need. I usually get back images that aren’t usable and then I have to go and take them myself (which is a waste my time). My goal with this presentation is to share my frustrations, and to show how I trained my staff to use the camera so that when I send them to get pictures of something I get the photographic image that I want with sufficient surrounding detail so I can tell where the photo was taken, what’s going on with the object, and nameplate data.

Even Data Centers Need PM Optimization

Even Data Centers Need PM Optimization

PM optimization is a systematic process to get the best equipment reliability. This is done by identifying and improving on weaknesses in maintenance performance and frequencies. PM optimization is a process, a series of questions or a guiding decision matrix, that helps make your preventive maintenance (PM) more efficient and effective. It enables the optimization of resources, while instilling best practices.

Reliability Engineer

Reliability Engineer Job Description Versus Maintenance Engineer Job Description

What does a reliability engineer do? How is a reliability engineer different from a maintenance engineer? Take a look:

 PinnacleART Received 2016 Aggie 100 Award Recognition for Sixth Straight Year

PinnacleART Received 2016 Aggie 100 Award Recognition for Sixth Straight Year

Texas A&M University recognized PinnacleART as a member of the 2016 Aggie 100, which honors the fastest-growing companies in the world, owned or operated by Texas A&M University Former Students.

Lloyd’s Register Acquires RTAMO Ltd in Move to Provide Cutting Edge Data-Driven Solutions

Real-time data-driven service revolutionises how critical infrastructure is maintained – offering asset owners smarter, lower cost and safer operations.

Asset Criticality on Campus – A Graphical Viewpoint

How do maintenance professionals at colleges, universities and technical schools stay on top of assets all over campus and decide the order in which they’re repaired? What’s more critical – ...

 Siemens and Bentley Systems Advance Strategic Alliance Including Joint Investment Initiatives

Siemens and Bentley Systems Advance Strategic Alliance Including Joint Investment Initiatives

To realize new growth opportunities in industry and infrastructure through integration of complementary digital engineering models

 Bentley Systems and Topcon Join Forces to Advance Cloud Services for ‘Constructioneering’

Bentley Systems and Topcon Join Forces to Advance Cloud Services for ‘Constructioneering’

Engineers’ connected data environments will span survey and construction processes for comprehensive project delivery benefits

Benchmarking OEE in the Era of Big Data

You may have seen OEE benchmark studies before, but you have never seen one based on Big Data principles. Sage Clarity studied manufacturing operations worldwide to benchmark performance and

  Largest Canadian Ethanol Producer Wins Emerson Reliability Award

Largest Canadian Ethanol Producer Wins Emerson Reliability Award

Largest Canadian ethanol producer wins Emerson Reliability Award for reducing carbon footprint, nearly doubling production

Ethanol Greenfield Quebec site prioritizes reliability as path to Top Quartile performance

 Emerson Targets $1 Trillion in Industry Losses with Operational Certainty™ Program

Emerson Targets $1 Trillion in Industry Losses with Operational Certainty™ Program

Emerson helps companies improve earnings as much as 15 percent and achieve Top Quartile performance